一本色道久久综合无码人妻,欧美成人精品 一区二区三区,色偷偷888欧美精品久久久,色天使亚洲综合一区二区

Hello, welcome to visit Jiangsu Haixin shipping Heavy Industry Co., Ltd. website!
Language:中文 English
Wonderful content loading
1 2 34

Trail run of “Xin Zilang3”     DATE: 2020-07-02 09:26:00    The author:本站

Trail run of  the 8000 m3 Trailing Suction Hopper Dredger——“Xin Zilang 3”
 
      On July 2, 2020, the 8000 M3 Trailing Suction Hopper Dredger (“Xinzilang No.3”) (“TSHD”)built for Jiangsu Haihong Construction Engineering Co., Ltd (“HAIHONG”) by Jiangsu Haixin Shipping Heavy Industry Co., Ltd. (“HAIXIN”) sailed for East China Sea for her sea trail and dredging test and has safely returned gac to HAIXIN’s outfitting wharf in the afternoon of July 6 after all relevant tests been successfully completed. The dredger is invested by HAIHONG, designed by MARIC and built by HAIXIN. With the compliance with IMO Tier III of emmision requirement, the dredger is suitable for dredging compaign in coastal port area and channels together with coastal maintenance project under unrestricted service deployment.
       
        During sea trial, various tests e.g. the release and recovery test of Rescue Boat and Llifeboat, loading test of Main Engine, Speed Test, Steering Test, Williamson Test, Shafting Power Test, Noise and Vibration Test etc. were all successfully being carried out with all index approved to reach or even above designed requirement, e.g. the speed under full loaded draft reached 14.8 Knots, which is 10% faster than designed speed and the light draught speed of 17.5 knots. During dredging operation, mud gate dumping test,DPDT dredging test were all successfully completed, among them 50 minutes taken with one underwater pump working,reached 60m depth; 25 minutes taken with two dredge pump working; 65 minutes taken for inboard pump dredging; all above data are far above designed requirement.
        The equipment configured in this THSD also have been upgraded in comparison with previous. In order to satisfy the dredging requirement of multiple terrain, the dredging depth of her starboard hopper arm can reach as deep as 60M and two sets of hopper head hanger are installed on starboard deck, which makes different depth dredging operation simaltenously is feasible, and with the control of DPDT system, high precision dredging mode such as DT dredging mode, DT navigation dredging mode, positioned dredging mode etc are all achievable. The underwater pump (mainly adopted for underwater dredging operation) and inboard pump (mainly adopted for discharging operation) equipped onboard enables the THSD to bring into fully play in dredging ability under clay discarding and excavating condition.
        The successful sea trial and dredging test of “Xinlangzi No.3” sets up a solid foundation for her smoothly delivery. During the following one week, project team will save no efforts to put her into operation in shortest time following rectification of those deficiencies raised during sea trail by means of elaborate organization of all relevant engineers and technicians.
PREVIOUS:【Steel-Cut Ceremony】60m Ferry
NEXT:【Contract Signing Ceremony】 60m Ferry

Copyright 2016-2019 Jiangsu Haixin shipping Heavy Industry Co., Ltd. all rights reserved 蘇ICP備10223514號-1
Hotline:0513-82181366 E_mail:jiangsuhaixin@jshxship.com
Adress:Number 3006 Xianggang Road,Binjiang Street,Haimen City,Jiangsu Province

ONLINE
TOP
久久精品亚洲综合专区| 少妇中文字幕乱码亚洲影视| 国产做无码视频在线观看| 奶头好大狂揉60分钟视频| 中文字幕人妻色偷偷久久| 亚洲精品久久久久久久久久久捆绑| 国产精品白丝av嫩草影院| 国产婷婷色综合av蜜臀av| 性色av 一区二区三区| 狂猛欧美激情性xxxx大豆行情| 精品国精品无码自拍自在线| 成人无码一区二区三区| 菠萝蜜视频在线观看入口 | 国产精品丝袜一区二区三区| 亚洲精品无码久久久久久久| 99精品国产再热久久无毒不卡| 亚洲国产精品久久艾草| 少妇伦子伦精品无吗| 日日躁夜夜躁狠狠躁| 国产乱子伦| 国产精品国产三级国产av中文| 麻豆成人精品国产免费| 亚洲成a人片在线观看www| 亚洲国产成人精品久久久| 西西午夜无码大胆啪啪国模 | 国产成人久久精品一区二区三区 | 亚洲综合激情另类小说区| 香蕉久久福利院| 中国精学生妹品射精久久| 亚洲va在线∨a天堂va欧美va| 亚洲区小说区图片区qvod| 97香蕉碰碰人妻国产欧美| 伊人久久大香线蕉av不变影院| 国产av无码专区亚洲awww| 在线 | 一区二区三区四区| 无码一区二区三区免费| 免费看黄色电影| 麻豆一区二区在我观看| 男女吃奶做爰猛烈紧视频| 日本午夜精品一区二区三区电影 | 免费看男阳茎进女阳道动态图|